|
|
Line 9: |
Line 9: |
| |Pub Type=good practice | | |Pub Type=good practice |
| |Pub Language=English | | |Pub Language=English |
| + | |Pub TOC=1. The Context of Flood Problem |
| + | |
| + | 2. River System and Rivers of Nepal |
| + | |
| + | 3. Flood Control Measures |
| + | |
| + | 4. Embankment and Embankment Protection Works |
| + | |
| + | 5. Spur |
| + | |
| + | 6. Implementation Arrangement |
| + | |
| + | 7. Construction Methods |
| + | |
| + | 8. Alternative Methods of Construction of Flood Control Structures |
| + | |
| + | 9. Economics |
| + | |
| + | 10. Repair and Maintenance |
| |Pub Permission=I have read the Terms and Conditions and hereby accept them. | | |Pub Permission=I have read the Terms and Conditions and hereby accept them. |
| |Pub Category=Climate Change | | |Pub Category=Climate Change |
Latest revision as of 13:52, 11 February 2013
Back to the publications overview page.
Title
|
Flood control measures
|
Subtitle
|
Best Practices Report
|
Author
|
Jha, H. et al.
|
Editor or Organisation
|
GIZ
|
Year
|
2000
|
Keywords
|
flood control, good practices, self-help, embankment, dikes, construction; repair, maintenance, watershed management, reforestation, organisation
|
Country
|
Nepal, highlands
|
Type
|
good practice
|
Language
|
English
|
Table of Contents
|
1. The Context of Flood Problem
2. River System and Rivers of Nepal
3. Flood Control Measures
4. Embankment and Embankment Protection Works
5. Spur
6. Implementation Arrangement
7. Construction Methods
8. Alternative Methods of Construction of Flood Control Structures
9. Economics
10. Repair and Maintenance
|
Abstract
|
|
Permission
|
Yes
|
Category
|
Climate Change
|
File
|
|